Expédition depuis et vers la République démocratique du Congo
Votre guide complet pour l’expédition depuis et vers la République démocratique du Congo. Trouvez le bon itinéraire, localisez les bureaux Maersk, découvrez les solutions locales, les options de paiement et plus encore.
Exportation
Obtenez les dernières informations locales à propos des procédures et des restrictions à l’export, des frais de surestaries et de détention, des livraisons de conteneur, etc.
Detention
The free-times is 30 days free Detention starting from the day of gate out empty till the return full into the terminal. Demurrage Not applicable.
Afterwards following rates are applicable for Detention (USD)
Cargo type | 20’ DRY/ 20’ Flat & Open top | 40’ DRY/ 40’ HC /45’ DRY/40’ Flat & Open top | 20 REEF | 40’ REEF/40’ HREEF/45’ HREEF |
---|---|---|---|---|
Cargo type
From Day 1 after free time expiry - onward
|
20’ DRY/ 20’ Flat & Open top
10
|
40’ DRY/ 40’ HC /45’ DRY/40’ Flat & Open top
20
|
20 REEF
10
|
40’ REEF/40’ HREEF/45’ HREEF
20
|
Export booking
Make your booking thru our Website bookingmodule. EDI solutions (e@sydoc) in french, for non stable Internet, directly sent to you by Email. Contact Customer Service cd.export@maersk.com if you require assistance.
Pick up containers
Empty containers can be taking at: Matadi port or Kinshasa depot
Commodity
Scrap: A Licence for export scrap must be allowed by DRC government. All exports to China are subject to China scrap import licence. No export are allowed to New Delhi.
Weight: General weight limitation is 23 tons. Each container has it own weight always check plates scales on containers to avoid overweight.
There has no overweight tax; vessels are not allowed to load overweight containers.
Reefer: DRC do not to export reefers containers for the moment.
The Deadline to submit the Verified the gross mass (VGM) details is 48 hours before the vessel arrival at the load port.
As a general guidance, the VGM should be received by Maersk prior to the cargo gate cut-off, before loading containers on the vessel.
No container will be loaded on board on a vessel without VGM, resulting in cargo delivery delays. Additionally, potential demurrage and/or detention charges may apply when a container is sitting idle at the terminal awaiting for VGM submission.
Port name | Service | Deadline |
---|---|---|
Port name
Matadi Port Terminal
|
Service
23H
|
Deadline
48 hours before vessel arrival at load port
|