In line with the increase in Tariff by Transnet, Maersk is adjusting all invoices to recover the Third-Party Cost for Import Terminal Handling Service Destination (DHC) for all cargo from World to Botswana, South Africa, Swaziland, Zimbabwe, Lesotho and Zambia
Our usual invoices reflect:
Terminal Handling Service – Destination: with the container quantity and the rate.
- Additional Service Import (ASI) where we are able to automatically update the charge
- 3rd Party Fine or Expense Import (PAD) where we are affecting a manual process to update the charge.
- The tariff levels are as follows:
| Charge Code | Rate basis | Size Type | Currency | Rate |
|---|---|---|---|---|
|
Charge Code
ASI / PAD
|
Rate basis
PER CONTAINER
|
Size Type
20ft DRY
|
Currency
ZAR
|
Rate
172
|
|
Charge Code
ASI / PAD
|
Rate basis
PER CONTAINER
|
Size Type
40ft DRY/ HDRY
|
Currency
ZAR
|
Rate
255
|
|
Charge Code
ASI / PAD
|
Rate basis
PER CONTAINER
|
Size Type
45ft DRY/ HDRY
|
Currency
ZAR
|
Rate
337
|
|
Charge Code
ASI / PAD
|
Rate basis
PER CONTAINER
|
Size Type
20ft REEF
|
Currency
ZAR
|
Rate
271
|
|
Charge Code
ASI / PAD
|
Rate basis
PER CONTAINER
|
Size Type
40ft REEF/ HREF
|
Currency
ZAR
|
Rate
402
|
|
Charge Code
ASI / PAD
|
Rate basis
PER CONTAINER
|
Size Type
45ft REEF/ HREF
|
Currency
ZAR
|
Rate
533
|
|
Charge Code
ASI / PAD
|
Rate basis
PER CONTAINER
|
Size Type
20ft DG
|
Currency
ZAR
|
Rate
241
|
|
Charge Code
ASI / PAD
|
Rate basis
PER CONTAINER
|
Size Type
40ft DG
|
Currency
ZAR
|
Rate
358
|
|
Charge Code
ASI / PAD
|
Rate basis
PER CONTAINER
|
Size Type
45ft DG
|
Currency
ZAR
|
Rate
474
|
- This adjustment for invoices does not apply to Export shipments.
- The above rates are also subject to other applicable surcharges, including local charges and contingency charges.
- These rates are unaffected by, and do not affect, any tariff notified, published, or filed in accordance with local regulatory requirements.
- For trades subject to the US Shipping Act or the China Maritime Regulations, quotations or surcharges that vary from the Maersk tariff shall not be binding on Maersk unless included in a service contract or service contract amendment that has been filed with the Federal Maritime Commission (FMC) or the Shanghai Shipping Exchange, as applicable.
Please could you ensure that all team members who process invoices for your import customers are aware of this important notice. We do invite you to reach out to us should any invoices need to be adjusted for the new tariff applicable.
We thank you for partnering with us during the transition of the new tariff being applied.
Please do not hesitate to reach out to us, we remain contactable via our usual channels.
We appreciate your business and look forward to continuing working with you in the future.